17 Cardinals Lane

Posted on: Jul 08, 2015

Richard Mintz and Helaine Greefeld

34 Farview Road

Posted on: Jun 01, 2015

Wood Rehoboth Investments, LLC

19 Harbor Road

Posted on: Apr 20, 2015

James and Mary McIntire

34 Farview Road

Posted on: Mar 19, 2015

Wood Rehoboth Investments, LLC

12 Ocean Drive

Posted on: Dec 30, 2014

Philip J. and Joann M. Burstein12/30/14- Received construction application,site plan, DNREC approval letter, and fee for a Dune Crossover 01/27/15 – Board voted to approve with CONDITIONS 02/04/15 – Receieved

58 Ocean Drive

Posted on: Dec 19, 2014

Mr and Mrs Raymond A. Mason12/19/14 – REceived construction application and plans for additions. No fee received. 12/22/14 – Received fee, and large set of plans in mail. Received caluculations

65 Anchor Road

Posted on: Dec 12, 2014

James and Bonnie May12/12/14 – Received application for repairs to Bulkhead. Pile driving expected. 12/15/14 – Received fee 12/30/14 – Comment deadline 12/31/14 – Board voted to approve 01/05/15 –

53 Ocean Drive

Posted on: Nov 24, 2014

Mary S. Haverback11/24/14 – Received PDF and hardcopy application, plans, and fee for improvement of deck rails 11/25/14 – Board did not see any need for comment, work was within

28 Farview Road

Posted on: Nov 21, 2014

David Fogle 11/21/14 – Received application and plans for construction of an elevator 11/25/14 – Received the fee 12/08/14 – Comment deadline 12/09/14 – Board voted to approve

44 Farview Road

Posted on: Oct 10, 2014

Farview 98, LLC10/10/14 – Receive Construction application and plans for a New House construction at 44 Farview Road 10/14/14 – Received the fee 10/15/14 – Confirmed receipt of 2 large

10 Farview Road

Posted on: Sep 30, 2014

Anne Slaughter Perrote09/30/14 – Received Construction application, site plan and photo, and fee for construction of a fence. Prepared Comment Deadline Letter 10/01/14 – Sent comment deadline letter to neighbors

16 Cardinals Lane

Posted on: Aug 14, 2014

Glen and Angela Urquhart08/13/14 – Received amended application and plans for an addition, with large set of plans and fee. Prepared Comment deadline 08/19/14 -Revised prints presented and forwarded to

75 Anchor Road

Posted on: Jul 22, 2014

James Denvir and Rangeley Wallace07/17/14 – Received plans and application by email for new house 07/21/14 – Received large set of plans and fee 07/22/14 – Prepared sent comment deadline

20 Ocean Drive

Posted on: Jul 17, 2014

Stephen and Susan Mandel07/09/14 – Received construction application and plans for landscaping 07/14/14 – Sent Costruction application information request 07/17/14 – Received fee and large set of plans in office.

28 Harbor Road

Posted on: Jul 03, 2014

Jeffery and Theresa Rihn07/03/14 – Received construction application, drawings, and fee for a fence and landscaping. Prepared comment deadline and 30 Day confirmation of receipt 07/16/14 – Comment deadline 08/05/14

87 Anchor Road

Posted on: Jul 03, 2014

Steve and Louisa Hollman07/03/14 – Received construction application for a Boat Dock and DNREC approval documents 07/05/14 – Received fee and hard copy of plans recept letter prepared 07/05/14 –

43 Farview Road

Posted on: Jun 27, 2014

Scott and Laura Schuebel06/27/14 – Have plans submitted with application and fee for construction of a pool fence and patio. 07/01/14 – prepared and sent comment deadline letter and confirmation

43 Farview Road

Posted on: May 19, 2014

Scott and Laura Schuebel05/19/14 – Received PDF plans, and new application for an addition and deck. Given boardpermission to begin pile driving to be completed by 5pm Thurs. 5/23/14. Fee

45 Farview Road

Posted on: Apr 15, 2014

Bryce Lingo04/15/14 – Received Application, plans, and fee for landscaping 04/28/14 – Approved

6 Cedar Road

Posted on: Apr 03, 2014

Peter and Connie Collis04/03/14 – Received application for construction of additions to the house at 6 Cedar, PDF plans, to-scale set of plans, and fee are received. Sending Comment deadline

43 Farview Road

Posted on: Apr 01, 2014

Scott and Laura Schuebel04/01/14 – Received an application and PDF plans for additions to house and landscaping 04/04/14 – Received fee 04/29/14 – Approved with contengencies and pile driving

31 Harbor Road

Posted on: Mar 26, 2014

William L. Walde03/26/14 – Received Construction application and plans for an Attached Garage addtition with email saying fee and to-scale prints have been mailed 03/27/14 – Received fee and large

75 Anchor Road

Posted on: Mar 26, 2014

Jim Denvir and Rangeley Wallace03/26/14 – Received Construction Application and plans for a Dock on the Canal. Sent a NS Construction Application information request letter for additional items needed for

16 Cardinals Lane

Posted on: Mar 18, 2014

Glen and Angela Urquhart03/15/14 – Received plans by email for agarage and storage area addition 03/18/14 – Large set of plans received in the office. No application or fee received

42 Ocean Drive

Posted on: Jan 09, 2014

Edith Schaeffer10/10/13 – Received construction application and plans for renovations.No large set of plans for office. No fee 10/15/13 – Fee received 01/04/14 – ARH recommends for approval 01/06/14 –

51 Anchor Road

Posted on: Jan 03, 2014

Mark and Elizabeth Gitenstein12/31/13 – Received large set of plans in the office for renovations 01/02/14 – Received constructionapplication and PDF plans for renovation. NO feel received 01/06/14 – sent

10 Holly Road

Posted on: Dec 17, 2013

Steve and Gillian Daniels12/17/13 – Received application and PDF plans for additions. Awaiting more items for full submittal 12/21/13 – ARH recommends approval of plans for review 12/23/13 – Received

48 Ocean Drive

Posted on: Dec 17, 2013

Mr and Mrs Melvyn Estrin12/16/13 – Received incomplete application, full set of PDF plans, and full set of large plans. No fee received. Sent application info request letter 12/20/13 –

16 Ocean Drive

Posted on: Nov 26, 2013

North Shores, CJM, LLC11/07/13 – Received construction application, plans PDF and LG set in office, and fee 11/12/13 – Sent plans to neighbors for comments 11/26/13 – Comment deadline 12/05/13

45 Farview Road

Posted on: Oct 29, 2013

Farview Anchor, LLC10/29/13 – Received PDF file, large set of plans and site plan, application, and fee for the addition of a deck and pool Prepared Comment deadline letter and

28 Harbor Road

Posted on: Oct 02, 2013

Jeff and Teresa Rihn10/2/13 – Received application, fee, PDF and Large set of plans, site plans for construction of a New House at 28 Harbor Sent back request for the

23 Cedar Road

Posted on: Sep 11, 2013

Joel Peters09/03/13 – Application for constructon of a second floor screened porch and other exterior improvements to the roof, siding, ect. 09/09/13 – Received complete plans and fee. Sent plans

56 Ocean Drive

Posted on: Sep 03, 2013

Paul and Emily Dodge09/03/13 – Application and plans submitted to the front steps to the house 09/09/13 – Plans and comment deadline letter was sent to neighbors 09/24/13 – Comment

56 Ocean Drive

Posted on: Jun 25, 2013

Paul and Emily Dodge06/25/13 – Application presented with plans for outside shower stalls, by email 07/01/13 – Comment deadline letter and plans sent to neighbors 07/15/13 – Comment deadline date

8 Farview Road

Posted on: May 28, 2013

Bruce Wilson and Lisa Wesfall 05/28/13 – Received construction application and plans for new house construction. Pile Driving expected after summer season 05/29/13 – Architectural Review Head recommends approval of

75 Anchor Road

Posted on: May 14, 2013

Rangeley Wallace and James Denvir05/13/13 – Received plans for addition (deck extension). Sent owner application to fill out 05/14/13 – Received application by email. Formed comment deadline letter 05/16/13 –

45 Farview Road

Posted on: May 03, 2013

Farview Anchor, LLC – Bryce M. Lingo05/02/13 – Complete application, plans, and fee were received in office. Comment deadline letter was prepared and sent with a copy of plans to

23 Robins Lane

Posted on: Apr 15, 2013

Mr and Mrs Mark Aron03/22/13 – Landscaping plans submitted to boad. Architectural Review Head (ARH) advised changes 04/03/13 – Revised plans submitted reflecting ARH advised changes, but did not indicate

18 Ocean Drive

Posted on: Apr 12, 2013

Louis J. and Saralynn Vollmer04/11/13 – Received application for constrution permit and set of plans by email for NEW HOUSE. There will be pile driving 04/15/13 – Architecural Review Head

18 Harbor Road

Posted on: Mar 28, 2013

William and Judy Decker/ Joan Adrian03/18/13 – Received Large set of plans in office with unsigned application for construction of new steps and deck 03/25/13 – Received signed application by

40 Farview Road

Posted on: Feb 14, 2013

Michael and Fredrica Sheehan02/14/13 – Receivedpermit application for construction of a deck 02/18/13 – Architectural Review Head advised that because the this was construction within the same footprint using similar

10 Holly Road

Posted on: Jan 28, 2013

Steven Daniels01/03/13 – Mr. Daniels Submitted landscaping plans by email. Forwarded to the NSBG for review. 01/11/13 – To -scale plans, received by Architecural Review Head. ARH recommends approval. 01/16/13

14 Ocean Drive

Posted on: Jan 18, 2013

Kenneth and Stacy Samet01/16/13 – Received application and plans for construction of a New House at 14 Ocean 01/18/13 – Sent plans with comment deadline letter to neighbors 01/20/13 –

43 Farview Road

Posted on: Dec 07, 2012

Scott and Laura Schuebel12/07/12 – Received construction application for a NEW HOUSE on empty lot, plans by email, and large set of plans for office. There are plans for PILE

87 Anchor Road

Posted on: Nov 20, 2012

Steven and Louisa Hollman10/31/2012 – Application for lot clearing and emergency restoration of lot conditions (fallen tree removal and drainage restoration) 10/31/2012 – Board approval of lot clearing and emergency

24 Ocean Drive

Posted on: Oct 24, 2012

Gerald Schaeffer10/23/12 – Application and Plans received for 24 Ocean to Extend the deck on the beach side. Sussex County building permit was included with the plans. No pile driving.

23 Bayberry Lane

Posted on: Oct 08, 2012

MJ Murphy Family Limited Partnership10/05/12 – Allyn Jane Ditmer submitted by email an application and plans for construction of an addition to 23 Bayberry. No pile driving expected 10/09/12 –

69 Anchor Road

Posted on: Sep 12, 2012

Sohn and Kaser09/11/12 – Plans for a Major renovation received by email 09/12/12 – Signed application received 09/12/12 – Large plans delivered to North Shores office 09/18/12 – Copies of

81 Anchor Road

Posted on: Sep 11, 2012

Christopher Savage09/07/12 – Application for construction of new house submitted 09/10/12 – Medium size plans received in office 09/10/12 – Approval of lot clearing, subject to conditions, including drainage/run-off control,

21 Robins Lane

Posted on: Sep 06, 2012

Helen Hoart and Bailey Starrett08/25/12 – Application received by email for new house 08/27/12 – Plans received 08/28/12 – Asked to disregard plans by owner, due to miscalculations. Revised plans

31 Cedar Road

Posted on: Sep 06, 2012

Mr Christopher Ballenger07/27/12 – Application received by email 07/30/12 – Plans received 08/13/12 – Comment deadline date 08/14/12 – Architectural review head approval 08/15/12 – Approved by board 09/04/12 –

23 Robins Lane

Posted on: Sep 06, 2012

Mr and Mrs Mark Aron07/16/12 – Application received by email 07/23/12 – Plans for New House received 08/06/12 – Comment deadline date 08/11/12 – Approved by architectural review head with

12 Ocean Drive

Posted on: Sep 06, 2012

Dr and Mrs Philip Burstein05/25/12 – Application and plans for new siding, roof work, and driveway received, No Pile driving 05/30/12 – Approval recommended by Arch. Review 06/09/12 – Positive

19 Harbor Road

Posted on: Sep 05, 2012

Mr and Mrs James McIntire02/10/12 – Application, plans to change roof and exterior and fee received for a complete submission 02/10/12 – Comment deadline letter sent to contiguous neighbors 02/22/12

30 Farview Road

Posted on: Mar 03, 2012

Robert Falb02/28/12 – Plan to change driveway from crushed stone to pavers shown to Board 03/15/12 – Comment deadline date 03/15/12 – Approved by board

8 Farview Road

Posted on: Jan 30, 2012

Bruce Wilson and Lisa Westfall 01/26/12 – Application and plans received 01/28/12 – Approved by arch review 02/10/12 – Comment Deadline Date 02/10/12 – Approved by board

40 Farview Road

Posted on: Dec 29, 2011

Mr and Mrs Michael Sheehan12/14/11 – Plans submitted for new and extended rear decks 12/23/11 – Request for variance of rear setback building line received 01/02/12 – Comment deadline date

62 Ocean Drive

Posted on: Aug 14, 2011

Bruce and Leslie Lane08/09/11 – New plans for new house were turned in by email 08/10/11 – Signed application form received. Owner and designer notified of need for hard copies,

33 Holly Road

Posted on: Aug 02, 2011

Yvonne and Bill Russell08/02/11 – Plans for new house and application form for construction permit were turned in to the office and by email attachment 08/03/11 – Hard copies of

14 Robins Lane

Posted on: Jun 17, 2011

Mr and Mrs William Lafferty06/06/11 – Landscaping/driveway plans received by email 06/14/11 – Certification submitted from Marcus Richardson, Landscape Designer, that he new Belgian block apron installed is set in

15 Harbor Road

Posted on: Jun 17, 2011

Mr and Mrs Thomas Brod06/17/11 – Preliminary sketches received to enclose deck into screened porch ; missing: N/S application form for construction permit, 2 sets of hard copies, calculation of

25 & 27 Holly Road

Posted on: Apr 14, 2011

O`Hara and Nussbaum/Spangler04/14/11 – Replace existing dock with enlarged, shared dock 04/28/11 – Comment deadline date 04/24/11 – Contractor, Rob Whitford of Precision Marine advised that new plans shortening the

59 Anchor Road

Posted on: Mar 15, 2011

Anchor Family LLP03/15/11 – New house 03/31/11 – Comment deadline 04/03/11 – Approved 04/06/11 – Pile driving scheduled to begin

21 Holly Road

Posted on: Nov 13, 2010

Roy and Patricia Lessy11/01/10 – (Then) prospective owner, Roy Lessy, submitted application for North Shores construction permit and large scale plans for new house. Pile driving is planned. 11/15/10 –

13 Holly Road

Posted on: Oct 20, 2010

Denise and Chris Carson10/20/10 – New House, pile driving planned for 11/15 to 11/19/2010 10/20/10 – Initial set of plans submitted 10/25/10 – Notice of adverse Architectural Review Report 10/26/10

14 Harbor Road

Posted on: Sep 21, 2010

Mr and Mrs Roger Warin09/21/10 – New Garage 10/05/10 – Comment deadline 09/28/10 – Revised plans submitted Approved

17 Bayberry Lane

Posted on: Sep 14, 2010

Bud Simon and Carol Pearson09/14/10 – Addition 09/28/10 – Comment deadline 09/29/10 – Approved

16 Harbor Road

Posted on: Aug 18, 2010

Parker Livingston and Beth Riegel 08/18/10 – New House, pile driving 09/06/10 – Comment deadline 09/10/10 – Approved 10/29/10 to 11/3/10 – Pile driving scheduled

29 Holly Road

Posted on: May 24, 2010

Mr and Mrs Christopher Moody05/24/10 – New house, pile driving 06/07/10 – Comment deadline 06/08/10 – Approved

54 Harbor Road

Posted on: Dec 30, 2009

Blake Patterson and Lynn McDougal12/30/09 – Addition of a 2nd floor 01/11/10 – Comment deadline 01/15/10 – Approved

53 Ocean Drive

Posted on: Dec 21, 2009

Dr and Mrs Chester Haverback12/21/09 – Side setback variance for elevator 12/28/09 – Comment deadline 01/06/10 – Approved

14 Harbor Road

Posted on: Dec 15, 2009

Mr and Mrs Rogert Warin12/15/09 – Exterior renovations and change in slant of roof 12/29/09 – Comment deadline 01/06/10 – Approved

8 Holly Road

Posted on: Aug 14, 2009

Mr and Mrs John Scarry08/14/09 – New house application submitted 08/28/08 – Comment deadline 09/01/08 – Approved

27 Holly Road

Posted on: May 18, 2009

Shaun Tull, Realtor and Yavar Rzayev, Architect05/18/09 – New house application 06/02/09 – Comment deadline 06/03/09 – Approved

38 Farview Road

Posted on: Aug 29, 2008

Christian Martin and Diane Repyneck08/29/08 – Application submitted 09/16/08 – Comment deadline 09/17/08 – Approved

16 Holly Road

Posted on: Aug 25, 2008

Martha Wilson08/25/08 – Privacy fence on the side yard, behind the car port

21 Harbor Road

Posted on: Dec 03, 2007

Mr and Mrs Robert Schreter12/03/07 – Replace pier with pier and dock 12/10/07 – Additional information requested 12/20/07 – Comment deadline 02/15/08- Additional information received 03/07/08 – Approved

15 Harbor Road

Posted on: Dec 03, 2007

Mr and Mrs Thomas Brod12/03/07 – Addition 12/18/07 – Comment deadline 12/21/07 – Approved

5 Ocean Drive

Posted on: Aug 30, 2007

Mr and Mrs Raymond Claery08/30/07 – Swimming pool and deck application – additional information requested 08/27/07 – Update received 09/10/07 – Comments deadline 09/18/07 – Plan modifications received and modified

26 Holly Road

Posted on: Aug 06, 2007

Ann Hamilton08/06/07 – Plans received for a house addition 08/13/07 – Additional information requested 08/15/07 – Comments deadline Amended preliminary plans received and approved

6 Ocean Drive

Posted on: Apr 27, 2007

Mr and Mrs Morton Macks04/27/07 – New house 05/11/07 – Comment deadline 05/15/07 – Preliminary plans approved 08/27/07 – Final plans approved

16 Farview Road

Posted on: Apr 02, 2007

P. Rosenquist04/02/07 – Deck replacement/enlargement 04/13/07 – Comment deadline

17 Harbor Road

Posted on: Mar 29, 2007

Joan Watt03/29/07 – Construction of swimming poolComment deadline 04/12/07 – Comment deadline 04/24/07 – Amended plans received 05/07/07 – Amended plans approved

11 Cedar Road

Posted on: Feb 16, 2007

Mr and Mrs Scott Parker02/16/07 – Plans for construction of addition submitted 03/01/07 – Comment deadline 03/09/07 – Preliminary plans approved

63 Anchor Road

Posted on: Nov 22, 2006

Dr and Mrs William Medford, Jr.11/22/06 – New house plans submitted 12/04/06 – Comment deadline 12/06/06 – Plans approved

32 Farview Road

Posted on: Nov 21, 2006

Shoreline Builders11/21/06 – New house plans submitted 11/30/06 – Plans approved

23 Harbor Road

Posted on: Sep 19, 2006

Richard and Marian Snyder09/19/05 – House addition plans submitted 10/10/06 – Plans approved

55 Anchor Road

Posted on: Jan 16, 2005

Ernest J. Ricco01/16/05 – New house plans submitted 11/28/05 – Amended plans approved